Last week we poured the multi-tiered concrete slab for the first floor of Original Music Workshop.
Concrete Pumping
Today, Branca Concrete Pumping and Corona Ready Mix poured hundreds of gallons of concrete onto a metal pan and steel beam structure to form the roof of the Original Music Workshop.