One of my favorite details on the facade of Original Music Workshop is finally coming to life.
Rough Brick and Glass Window Detail
I love this in-progress window detail on our design for Original Music Workshop.
Construction Progress at Original Music Workshop
Construction at Original Music Workshop is moving along swiftly. These photos show the interior performance hall and a few structural details. Notably, the springs footings for columns and beams have been put into place. These footings isolate the structure of the performance hall from vibration to reduce the amount of noise that can enter or escape the room.