• Profile
  • Press
  • Contact

Alexander Pincus

  • Profile
  • Press
  • Contact

Construction Progress at Original Music Workshop

View fullsize Original Music Workshop Interior
View fullsize Isolation Spring at Original Music Workshop ​
View fullsize Isolation Spring at Original Music Workshop
View fullsize V Column at Original Music Workshop​
View fullsize Wall Mounted Isolation Spring at Original Music Workshop​
View fullsize Wall Mounted Isolation Springs at Original Music Workshop​

Construction at Original Music Workshop is moving along swiftly. These photos show the interior performance hall and a few structural details. Notably, the springs footings for columns and beams have been put into place. These footings isolate the structure of the performance hall from vibration to reduce the amount of noise that can enter or escape the room.

tags: Photography, Black and White, Original Music Workshop, Construction Details, Bureau V, Isolation Spring, V Column, Performance hall, Arup, Kinetics, Steel, Alcon Builders Group
categories: Construction
Monday 04.29.13
Posted by Alexander Pincus
 

First Floor Steelwork At OMW

Original Music Workshop First Floor Steelwork

Steelwork on the first level of the Original Music Workshop is nearing completion.

tags: Original Music Workshop, Bureau V, Steel, Alcon Builders Group
categories: Construction
Wednesday 01.23.13
Posted by Alexander Pincus