• Profile
  • Press
  • Contact

Alexander Pincus

  • Profile
  • Press
  • Contact

Assembly

Candelabra Assembly

These proofsheets show various configurations of our chandelier during assembly.

tags: Hernan Diaz Alonso, Independent Study, Minimal Surface, Chandelier, Assembly, Candelabra, Subdivision Surface
categories: Graduate Work
Friday 05.27.05
Posted by Alexander Pincus
 

Component 1

Prototype Component

This is the first finished component of the chandelier I am designing with David Boira and Zoe Coombes.  Only 31 more to make...

tags: Hernan Diaz Alonso, Independent Study, Zoe Coombes, Minimal Surface, Commonwealth, David Boira, Candelabra, Subdivision Surface, Columbia University GSAPP
categories: Graduate Work
Monday 05.02.05
Posted by Alexander Pincus
 

Prototype Fabrication

SCI-Arc’s 3-axis mill carving a mold out of laminated particle board

SCI-Arc’s 3-axis mill carving a mold out of laminated particle board

David Boira removing the first vacuum forming test at the Warner Brothers set building shop in L.A.

David Boira removing the first vacuum forming test at the Warner Brothers set building shop in L.A.

Two unfinished components with the a test connector plate

Two unfinished components with the a test connector plate

72 component halves made from vacuum formed PETG plastic

72 component halves made from vacuum formed PETG plastic

Zoe Coombes finishing the fiberglass connection between the two halves of a component at PS-1

Zoe Coombes finishing the fiberglass connection between the two halves of a component at PS-1

My brother Miles preparing a component for another round of autobody paint
My brother Miles preparing a component for another round of autobody paint
tags: Hernan Diaz Alonso, Vacuum Forming, CNC Milling, Independent Study, Zoe Coombes, Commonwealth, David Boira, Candelabra, SCI-Arc, Columbia University GSAPP
categories: Construction
Wednesday 04.27.05
Posted by Alexander Pincus